ࡱ>  !"#$%&'()*+,-.0123456789:;<=Root Entry7D6CONTENTSi0MATRIXINFOAUTHORINFOTNEEST........................LC:\Program Files\Craftsman\National Estimator\Costbooks\2007 Improvement.cbk????? Contingency`@PTEaMb*@fffff|@\(@c@fffffȋ@)\7@cCParagraphPT_HEADING14 Qty Craft@Hours Unit Material Labor Equipment TotalCParagraphPT_TEXTEstimate Template:Bathroom Addition 3Current bath/shower is steel with shower curtain. Part of subfloor suffers from water damage and rot because of failure of shower curtain.  Proposal: Add new sliding glass shower door. Remove/replace toilet with new water-saving toilet. Replace shut-off valve and supply hose. Demo damaged sections of subfloor and replace with fresh plywood, replace linoleum floor. Repair water damage and paint bathroom.PBypass door tub enclosure, American Shower & Bath. 60" wide opening. With track.Brass, hammertone glassOrigin(10013,355,15327)CParagraphPT_ESTCOSTBrass, hammertone glass ?BCQC@Ea333333?a@G@xg@a@G@xg@333333?pMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,355,15327)CParagraphPT_SUBTOTAL_MARKER Tub enclosure?BCEa333333?a@G@g@a@G@g@333333?Remove old toilet?B1(\5B@Eaffffff?LA@LA@LA@LA@ffffff? Remove Toilet?B1Eaffffff?LA@LA@LA@LA@ffffff?Bathroom Floor subfloor/vinylBold(1,12);MATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});KEYWORDS("Backerboard:RhinoBoard","RhinoBoard");Origin(10013,295,12694)Remove flooring and damaged subflooring. Per 100 square feet of floor. Using a long handle spudding spade. Includes removing baseboard as required. Debris piled on site. No salvage of materials or furniture moving included.Origin(10013,278,11789)Remove flooringARemove nailed hardwood floor and prepare surface for new flooringOrigin(10013,278,11789)BRemove nailed hardwood floor and prepare surface for new flooring @BFq= ףPB@CSF(\ @y]@y]@ym@ym@(\@pMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,278,11789)Origin(10013,66,3091)Plywood sheathing&Remove damaged plywood floor sheathingOrigin(10013,66,3091)! Remove plywood floor sheathing I@B1(\5B@SF{Gz?\(\?\(\?@B@@B@?nMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,66,3091)MATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});KEYWORDS("Plywood:sheathing","Plywood:subfloor","Sheathing:carpentry","Subfloor:plywood");Origin(10013,66,3086)pReplace plywood sheathing, CD standard exterior grade. Material costs shown include fasteners and 5% for waste. Plywood sheathingOrigin(10013,66,3088)1/2"Origin(10013,66,3088) 1/2" I@B1(\5B@SF~jt??)\(?zG?4@6@E@333333?nMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,66,3088)!Remove & replace damaged subfloorY@B1SFjt @= ףp=?Gz]@Q]@ffffff4@dr@33333s@Gz @Picture(1517,Sandstone);Bold(1,39);MATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});KEYWORDS("Armstrong","Flooring:sheet vinyl","Flooring:vinyl roll","Sheet flooring:vinyl","Themes sheet vinyl flooring","Vinyl flooring:roll","Vinyl flooring:sheet");Origin(10013,287,12237)Install Vinyl Floor Themes sheet vinyl flooring, Armstrong. Easy to clean. ToughGuard durability. Guaranteed to not rip, tear or gouge. 10-year limited warranty. Urethane no-wax wear layer. 12' wide rolls. 0.08" thick. 2.9 Performance Appearance Rating. Includes adhesive and 10% waste.&Themes sheet vinyl flooring, ArmstrongOrigin(10013,287,12238)Most colors and designsOrigin(10013,287,12238)Most colors and designs 4@BFq= ףPB@SY333333?(@{G%@> ףp6@n@yk@̼|@@pMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,287,12238)Install Vinyl Floor4@BFSY333333?{Gz(@{G%@{G:7@n@yk@ }@@Bold(1,39);MATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});KEYWORDS("Backerboard:ceramic tile","Ceramic tile:backerboard","Hardibacker","James Hardie","Tile backerboard");Origin(10013,295,12698)Install new toilet#Hamilton one-piece toilet, American Standard. Vitreous china. Low consumption. Elongated siphon action bowl. Includes color-matched Rise and Shine plastic seat and cover with lift-off hinge. 2-bolt cap. Labor includes setting and connection only. Add the cost of wall stop valve and piping.Picture(2067,Round front bowl);Bold(1,45);MATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});KEYWORDS("American Standard","Toilets:Hamilton","Toilets:one-piece");Origin(10013,363,15710),Hamilton one-piece toilet, American StandardOrigin(10013,363,15711)BoneOrigin(10013,363,15711) Bone ?P1HzC@Ea?q@\(|E@Q?t@q@\(|E@Q?t@?pMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,363,15711)SBold(1,37);MATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});Origin(10013,352,15151)Remove and replace toilet fill valve. Turn water off. Empty tank. Remove valve nut and disconnect supply tube. Install new toilet fill valve. Tighten nut. Attach supply tube. Turn water on. Check operation.$Remove and replace toilet fill valveOrigin(10013,352,15152)Per fill valveOrigin(10013,352,15152)Per fill valve ?P1HzC@Ea333333?q= ףp'@q= ףp'@q= ףp'@q= ףp'@333333?MATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});KEYWORDS("Toilet fill valve:remove & replace","Valves:toilet, remove & replace");MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,352,15152)Install supply tube?P1HzC@Ea?@ ףp=#@ ףp=-@@ ףp=#@ ףp=-@?Toilet Installation@P1Eaffffff?R9r@= ףpP@zGAv@R9r@= ףpP@zGAv@ffffff?BLabor for caulking (around baseboard, fixtures, tub, toilet, etc.)1/8" gap, per 100 linear feetOrigin(10013,466,20051)1/8" gap, per 100 linear feet ?PT33333D@CLFp= ף? ףp=N@ ףp=N@ ףp=N@ ףp=N@p= ף?pMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,466,20051)Caulking?PTCLFp= ף? ףp=N@ ףp=N@ ףp=N@ ףp=N@p= ף?Origin(10013,466,20023)Cost to repaint a home interior Prep work?P1HzC@Ea?(\4@(\4@(\4@(\4@?!Repaint bath, per 100 SF of floorOrigin(10013,466,20023)-Repaint a home interior, per 100 SF of floor ?PT33333D@CSF@0@ ^@ a@0@ ^@ a@@pMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,466,20023)Bold(1,44);MATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});KEYWORDS("Door frame:painting labor","Door trim:painting labor","Frame:painting labor","Painting labor, manhours:door frame and trim","Trim:painting labor");Origin(10013,471,20268)bLabor for painting interior panel door, frame and trim -- roll and brush. Paint application only. Bold(1,72);MATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});KEYWORDS("Door:painting labor","Painting labor, manhours:interior doors");Origin(10013,472,20362)KRoll and brush 1 coat of water-base undercoat, 7 doors per gallon, per doorOrigin(10013,472,20364)LRoll and brush 1 coat of water-base undercoat, 7 doors per gallon, per door ?PT33333D@EaQ?*@*@*@*@Q?pMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,472,20364)GLabor for painting interior panel door, frame and trim roll and brushOrigin(10013,472,20366)RRoll and brush 1st finish coat of water-base enamel, 10 doors per gallon, per doorOrigin(10013,472,20366)SRoll and brush 1st finish coat of water-base enamel, 10 doors per gallon, per door ?PT33333D@Ea333333?(@(@(@(@333333?pMATRIXID({C0632791-CCB2-493F-882A-41B37C3A0471});MATFACT(AR2);LABFACT(ZR24);EQPFACT(AR1);Origin(10013,472,20366)Painting@PTEaQ@Gz0@Rd@Gzf@Gz0@Rd@Gzf@Q@CParagraphPT_ESTIMATE_LAST CParagraphPT_GRAPHIC_LINE CParagraphPT_AUTOMATIC_LINECParagraphPT_EST_TOTAL_MMLE/Total Manhours, Material, Labor, and Equipment:`@PTEaMb*@fffff|@\(@zGG@c@fffffȋ@@)\7@CParagraphPT_EST_TOTAL_SUBSTotal Only (Subcontract) Costs:WCParagraphPT_ESTIMATE_SUBTOTAL Subtotal:!`@PTEaMb*@fffff|@\(@c@fffffȋ@)\7@WCParagraphPT_MARKUP_OVERHEADOverhead1CParagraphPT_MARKUP_CONTINGENCY Contingency*1CParagraphPT_MARKUP_PROFITProfit1WCParagraphPT_ESTIMATE_TOTALEstimate Total:`@PTEaMb*@fffff|@\(@c@fffffȋ@)\7@WCParagraphPT_TAX_MATERIALSTax on Materials:"CParagraphPT_TAX_LABOR Tax on Labor:#CParagraphPT_TAX_EQUIPMENTTax on Equipment:$CParagraphPT_TAX_SUBSTax on Total Only Costs:%CParagraphPT_TAX_CONTRACTTax on the Contract Price&WCParagraphPT_GRAND_TOTAL Grand Total:' M<AuthorProjectInfo><CompanyInfo profile="" Name="CBC" Contact="bill grote" Street1="9999 fd st" Street2="CBC" City="Escondido" State="CA" Zip="92009" Country="US" Phone="" Web="" Email="bill@costbook.com" Fax="" taxexemptnumber=""/><EstimateInfo EstimateID="" EstimatorName="" EstimatedDate="" Comments="" SpecialInstructions=""/><JobInfo JobName="" Contact="" Street1="" Street2="" City="" State="" Zip="" Country="" Phone="" Web="" Email="" Fax=""/><CustomerInfo Contact="" Company="" Street1="" Street2="" City="" State="" Zip="" Country="" Web="" Email="" Fax=""/></AuthorProjectInfo>JCW-PLAIN <JCW-ADJUST/8KEYLINE|NOT ADJUSTED|LaborRate|Per Unit|CraftCode|UnitHours|Unit|UnitMaterial|UnitLabor|UnitEquipment|UnitTotal|Qty|CraftCode|TotalHours|Unit|TotalMaterial|TotalLabor|TotalEquipment|Total| ADJUSTMENTS|HRS|1.0000|MAT|1.0000|LAB|1.0000|EQP|1.0000|TOT|1.0000| MARKUPS|OVERHEAD|0.0000|PROFIT|0.0000| TAXES|CONTRACT|0.0000|MAT|0.0000|LAB|0.0000|EQP|0.0000|SUB|0.0000| HDR1| Qty Craft@Hours Unit Material Labor Equipment Total TXT|Estimate Template: TXT|Bathroom Addition 3 TXT| TXT|Current bath/shower is steel with shower curtain. Part of subfloor suffers from water damage and rot because of failure of shower curtain. TXT| TXT| Proposal: Add new sliding glass shower door. Remove/replace toilet with new water-saving toilet. Replace shut-off valve and supply hose. Demo damaged sections of subfloor and replace with fresh plywood, replace linoleum floor. Repair water damage and paint bathroom. TXT| TXT| TXT|Bypass door tub enclosure, American Shower & Bath. 60" wide opening. With track. TXT|Brass, hammertone glass ECST|39.7900|Per Unit|BC|1.2000|Ea|142.8000|47.7500|0.0000|190.5500|1.0000|BC|1.2000|Ea|142.8000|47.7500|0.0000|190.5500| SMKR|0.0000|Per Unit|BC|1.2000|Ea|142.8000|47.7500|0.0000|190.5500|1.0000|BC|1.2000|Ea|142.8000|47.7500|0.0000|190.5500|Tub enclosure TXT|Remove old toilet ECST|36.4200|Per Unit|B1|0.9500|Ea|0.0000|34.6000|0.0000|34.6000|1.0000|B1|0.9500|Ea|0.0000|34.6000|0.0000|34.6000| SMKR|0.0000|Per Unit|B1|0.9500|Ea|0.0000|34.6000|0.0000|34.6000|1.0000|B1|0.9500|Ea|0.0000|34.6000|0.0000|34.6000|Remove Toilet TXT| TXT| TXT|Bathroom Floor subfloor/vinyl TXT| TXT|Remove flooring and damaged subflooring. Per 100 square feet of floor. Using a long handle spudding spade. Includes removing baseboard as required. Debris piled on site. No salvage of materials or furniture moving included. TXT| TXT|Remove flooring TXT|Remove nailed hardwood floor and prepare surface for new flooring ECST|36.6300|Per Unit|BF|3.2200|CSF|0.0000|117.9000|0.0000|117.9000|2.0000|BF|6.4400|CSF|0.0000|235.8000|0.0000|235.8000| TXT| TXT|Plywood sheathing TXT|Remove damaged plywood floor sheathing ECST|36.4200|Per Unit|B1|0.0200|SF|0.0000|0.7300|0.0000|0.7300|50.0000|B1|1.0000|SF|0.0000|36.5000|0.0000|36.5000| TXT| TXT|Replace plywood sheathing, CD standard exterior grade. Material costs shown include fasteners and 5% for waste. TXT|Plywood sheathing TXT|1/2" ECST|36.4200|Per Unit|B1|0.0120|SF|0.4100|0.4400|0.0000|0.8500|50.0000|B1|0.6000|SF|20.4000|22.0000|0.0000|42.4000| SMKR|0.0000|Per Unit|B1|3.2520|SF|0.4100|119.0700|0.0000|119.4800|102.0000|B1|8.0400|SF|20.4000|294.3000|0.0000|314.7000|Remove & replace damaged subfloor TXT| TXT|Install Vinyl Floor TXT|Themes sheet vinyl flooring, Armstrong. Easy to clean. ToughGuard durability. Guaranteed to not rip, tear or gouge. 10-year limited warranty. Urethane no-wax wear layer. 12' wide rolls. 0.08" thick. 2.9 Performance Appearance Rating. Includes adhesive and 10% waste. TXT|Themes sheet vinyl flooring, Armstrong TXT|Most colors and designs ECST|36.6300|Per Unit|BF|0.3000|SY|12.2400|10.9900|0.0000|23.2300|20.0000|BF|6.0000|SY|244.8000|219.8000|0.0000|464.6000| SMKR|0.0000|Per Unit|BF|0.3000|SY|12.2400|10.9900|0.0000|23.2300|20.0000|BF|6.0000|SY|244.8000|219.8000|0.0000|464.6000|Install Vinyl Floor TXT| TXT|Install new toilet TXT|Hamilton one-piece toilet, American Standard. Vitreous china. Low consumption. Elongated siphon action bowl. Includes color-matched Rise and Shine plastic seat and cover with lift-off hinge. 2-bolt cap. Labor includes setting and connection only. Add the cost of wall stop valve and piping. TXT|Hamilton one-piece toilet, American Standard TXT|Bone ECST|39.0600|Per Unit|P1|1.1000|Ea|286.6200|42.9700|0.0000|329.5900|1.0000|P1|1.1000|Ea|286.6200|42.9700|0.0000|329.5900| TXT| TXT|Remove and replace toilet fill valve. Turn water off. Empty tank. Remove valve nut and disconnect supply tube. Install new toilet fill valve. Tighten nut. Attach supply tube. Turn water on. Check operation. TXT|Remove and replace toilet fill valve TXT|Per fill valve ECST|39.0600|Per Unit|P1|0.3000|Ea|0.0000|11.7200|0.0000|11.7200|1.0000|P1|0.3000|Ea|0.0000|11.7200|0.0000|11.7200| TXT|Install supply tube ECST|39.0600|Per Unit|P1|0.2500|Ea|5.0000|9.7700|0.0000|14.7700|1.0000|P1|0.2500|Ea|5.0000|9.7700|0.0000|14.7700| SMKR|0.0000|Per Unit|P1|1.6500|Ea|291.6200|64.4600|0.0000|356.0800|3.0000|P1|1.6500|Ea|291.6200|64.4600|0.0000|356.0800|Toilet Installation TXT| TXT|Labor for caulking (around baseboard, fixtures, tub, toilet, etc.) TXT|1/8" gap, per 100 linear feet ECST|40.1500|Per Unit|PT|1.5400|CLF|0.0000|61.8300|0.0000|61.8300|1.0000|PT|1.5400|CLF|0.0000|61.8300|0.0000|61.8300| SMKR|0.0000|Per Unit|PT|1.5400|CLF|0.0000|61.8300|0.0000|61.8300|1.0000|PT|1.5400|CLF|0.0000|61.8300|0.0000|61.8300|Caulking TXT| TXT|Cost to repaint a home interior TXT| TXT|Prep work ECST|39.0600|Per Unit|P1|0.5250|Ea|0.0000|20.5100|0.0000|20.5100|1.0000|P1|0.5250|Ea|0.0000|20.5100|0.0000|20.5100| TXT| TXT|Repaint bath, per 100 SF of floor ECST|40.1500|Per Unit|PT|3.0000|CSF|16.8300|120.5000|0.0000|137.3300|1.0000|PT|3.0000|CSF|16.8300|120.5000|0.0000|137.3300| TXT| TXT|Labor for painting interior panel door, frame and trim -- roll and brush. Paint application only. TXT|Roll and brush 1 coat of water-base undercoat, 7 doors per gallon, per door ECST|40.1500|Per Unit|PT|0.3300|Ea|0.0000|13.2500|0.0000|13.2500|1.0000|PT|0.3300|Ea|0.0000|13.2500|0.0000|13.2500| TXT|Labor for painting interior panel door, frame and trim roll and brush TXT|Roll and brush 1st finish coat of water-base enamel, 10 doors per gallon, per door ECST|40.1500|Per Unit|PT|0.3000|Ea|0.0000|12.0500|0.0000|12.0500|1.0000|PT|0.3000|Ea|0.0000|12.0500|0.0000|12.0500| SMKR|0.0000|Per Unit|PT|4.1550|Ea|16.8300|166.3100|0.0000|183.1400|4.0000|PT|4.1550|Ea|16.8300|166.3100|0.0000|183.1400|Painting ELST| TXT| LINE| AUTO| ETMM|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|968.9100|132.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|1605.5000| ETTO|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| AUTO| SUBT|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|0.0000|132.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|1605.5000| AUTO| OVHD|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|0.0000|0.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|0.0000| CTIN|0.0000|Per Unit|Contingency|0.0000|1|0.0000|0.0000|0.0000|0.0000|0.0000|Contingency|0.0000|1|0.0000|0.0000|0.0000|0.0000| PROF|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|0.0000|0.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|0.0000| AUTO| ETTL|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|0.0000|0.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|1605.5000| AUTO| TAXM|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| TAXL|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| TAXE|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| TAXS|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| TAXC|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| AUTO| EGT|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|1605.5000| KEYLINE|ADJUSTED|LaborRate|Per Unit|CraftCode|UnitHours|Unit|UnitMaterial|UnitLabor|UnitEquipment|UnitTotal|Qty|CraftCode|TotalHours|Unit|TotalMaterial|TotalLabor|TotalEquipment|Total| ADJUSTMENTS|HRS|1.0000|MAT|1.0000|LAB|1.0000|EQP|1.0000|TOT|1.0000| MARKUPS|OVERHEAD|0.0000|PROFIT|0.0000| TAXES|CONTRACT|0.0000|MAT|0.0000|LAB|0.0000|EQP|0.0000|SUB|0.0000| HDR1| Qty Craft@Hours Unit Material Labor Equipment Total TXT|Estimate Template: TXT|Bathroom Addition 3 TXT| TXT|Current bath/shower is steel with shower curtain. Part of subfloor suffers from water damage and rot because of failure of shower curtain. TXT| TXT| Proposal: Add new sliding glass shower door. Remove/replace toilet with new water-saving toilet. Replace shut-off valve and supply hose. Demo damaged sections of subfloor and replace with fresh plywood, replace linoleum floor. Repair water damage and paint bathroom. TXT| TXT| TXT|Bypass door tub enclosure, American Shower & Bath. 60" wide opening. With track. TXT|Brass, hammertone glass ECST|39.7900|Per Unit|BC|1.2000|Ea|142.8000|47.7500|0.0000|190.5500|1.0000|BC|1.2000|Ea|142.8000|47.7500|0.0000|190.5500| SMKR|0.0000|Per Unit|BC|1.2000|Ea|142.8000|47.7500|0.0000|190.5500|1.0000|BC|1.2000|Ea|142.8000|47.7500|0.0000|190.5500|Tub enclosure TXT|Remove old toilet ECST|36.4200|Per Unit|B1|0.9500|Ea|0.0000|34.6000|0.0000|34.6000|1.0000|B1|0.9500|Ea|0.0000|34.6000|0.0000|34.6000| SMKR|0.0000|Per Unit|B1|0.9500|Ea|0.0000|34.6000|0.0000|34.6000|1.0000|B1|0.9500|Ea|0.0000|34.6000|0.0000|34.6000|Remove Toilet TXT| TXT| TXT|Bathroom Floor subfloor/vinyl TXT| TXT|Remove flooring and damaged subflooring. Per 100 square feet of floor. Using a long handle spudding spade. Includes removing baseboard as required. Debris piled on site. No salvage of materials or furniture moving included. TXT| TXT|Remove flooring TXT|Remove nailed hardwood floor and prepare surface for new flooring ECST|36.6300|Per Unit|BF|3.2200|CSF|0.0000|117.9000|0.0000|117.9000|2.0000|BF|6.4400|CSF|0.0000|235.8000|0.0000|235.8000| TXT| TXT|Plywood sheathing TXT|Remove damaged plywood floor sheathing ECST|36.4200|Per Unit|B1|0.0200|SF|0.0000|0.7300|0.0000|0.7300|50.0000|B1|1.0000|SF|0.0000|36.5000|0.0000|36.5000| TXT| TXT|Replace plywood sheathing, CD standard exterior grade. Material costs shown include fasteners and 5% for waste. TXT|Plywood sheathing TXT|1/2" ECST|36.4200|Per Unit|B1|0.0120|SF|0.4100|0.4400|0.0000|0.8500|50.0000|B1|0.6000|SF|20.4000|22.0000|0.0000|42.4000| SMKR|0.0000|Per Unit|B1|3.2520|SF|0.4100|119.0700|0.0000|119.4800|102.0000|B1|8.0400|SF|20.4000|294.3000|0.0000|314.7000|Remove & replace damaged subfloor TXT| TXT|Install Vinyl Floor TXT|Themes sheet vinyl flooring, Armstrong. Easy to clean. ToughGuard durability. Guaranteed to not rip, tear or gouge. 10-year limited warranty. Urethane no-wax wear layer. 12' wide rolls. 0.08" thick. 2.9 Performance Appearance Rating. Includes adhesive and 10% waste. TXT|Themes sheet vinyl flooring, Armstrong TXT|Most colors and designs ECST|36.6300|Per Unit|BF|0.3000|SY|12.2400|10.9900|0.0000|23.2300|20.0000|BF|6.0000|SY|244.8000|219.8000|0.0000|464.6000| SMKR|0.0000|Per Unit|BF|0.3000|SY|12.2400|10.9900|0.0000|23.2300|20.0000|BF|6.0000|SY|244.8000|219.8000|0.0000|464.6000|Install Vinyl Floor TXT| TXT|Install new toilet TXT|Hamilton one-piece toilet, American Standard. Vitreous china. Low consumption. Elongated siphon action bowl. Includes color-matched Rise and Shine plastic seat and cover with lift-off hinge. 2-bolt cap. Labor includes setting and connection only. Add the cost of wall stop valve and piping. TXT|Hamilton one-piece toilet, American Standard TXT|Bone ECST|39.0600|Per Unit|P1|1.1000|Ea|286.6200|42.9700|0.0000|329.5900|1.0000|P1|1.1000|Ea|286.6200|42.9700|0.0000|329.5900| TXT| TXT|Remove and replace toilet fill valve. Turn water off. Empty tank. Remove valve nut and disconnect supply tube. Install new toilet fill valve. Tighten nut. Attach supply tube. Turn water on. Check operation. TXT|Remove and replace toilet fill valve TXT|Per fill valve ECST|39.0600|Per Unit|P1|0.3000|Ea|0.0000|11.7200|0.0000|11.7200|1.0000|P1|0.3000|Ea|0.0000|11.7200|0.0000|11.7200| TXT|Install supply tube ECST|39.0600|Per Unit|P1|0.2500|Ea|5.0000|9.7700|0.0000|14.7700|1.0000|P1|0.2500|Ea|5.0000|9.7700|0.0000|14.7700| SMKR|0.0000|Per Unit|P1|1.6500|Ea|291.6200|64.4600|0.0000|356.0800|3.0000|P1|1.6500|Ea|291.6200|64.4600|0.0000|356.0800|Toilet Installation TXT| TXT|Labor for caulking (around baseboard, fixtures, tub, toilet, etc.) TXT|1/8" gap, per 100 linear feet ECST|40.1500|Per Unit|PT|1.5400|CLF|0.0000|61.8300|0.0000|61.8300|1.0000|PT|1.5400|CLF|0.0000|61.8300|0.0000|61.8300| SMKR|0.0000|Per Unit|PT|1.5400|CLF|0.0000|61.8300|0.0000|61.8300|1.0000|PT|1.5400|CLF|0.0000|61.8300|0.0000|61.8300|Caulking TXT| TXT|Cost to repaint a home interior TXT| TXT|Prep work ECST|39.0600|Per Unit|P1|0.5250|Ea|0.0000|20.5100|0.0000|20.5100|1.0000|P1|0.5250|Ea|0.0000|20.5100|0.0000|20.5100| TXT| TXT|Repaint bath, per 100 SF of floor ECST|40.1500|Per Unit|PT|3.0000|CSF|16.8300|120.5000|0.0000|137.3300|1.0000|PT|3.0000|CSF|16.8300|120.5000|0.0000|137.3300| TXT| TXT|Labor for painting interior panel door, frame and trim -- roll and brush. Paint application only. TXT|Roll and brush 1 coat of water-base undercoat, 7 doors per gallon, per door ECST|40.1500|Per Unit|PT|0.3300|Ea|0.0000|13.2500|0.0000|13.2500|1.0000|PT|0.3300|Ea|0.0000|13.2500|0.0000|13.2500| TXT|Labor for painting interior panel door, frame and trim roll and brush TXT|Roll and brush 1st finish coat of water-base enamel, 10 doors per gallon, per door ECST|40.1500|Per Unit|PT|0.3000|Ea|0.0000|12.0500|0.0000|12.0500|1.0000|PT|0.3000|Ea|0.0000|12.0500|0.0000|12.0500| SMKR|0.0000|Per Unit|PT|4.1550|Ea|16.8300|166.3100|0.0000|183.1400|4.0000|PT|4.1550|Ea|16.8300|166.3100|0.0000|183.1400|Painting ELST| TXT| LINE| AUTO| ETMM|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|968.9100|132.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|1605.5000| ETTO|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| AUTO| SUBT|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|0.0000|132.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|1605.5000| AUTO| OVHD|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|0.0000|0.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|0.0000| CTIN|0.0000|Per Unit|Contingency|0.0000|1|0.0000|0.0000|0.0000|0.0000|0.0000|Contingency|0.0000|1|0.0000|0.0000|0.0000|0.0000| PROF|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|0.0000|0.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|0.0000| AUTO| ETTL|0.0000|Per Unit|PT|13.0470|Ea|463.9000|505.0100|0.0000|0.0000|0.0000|PT|23.5350|Ea|716.4500|889.0500|0.0000|1605.5000| AUTO| TAXM|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| TAXL|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| TAXE|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| TAXS|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| TAXC|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|0.0000| AUTO| EGT|0.0000|Per Unit||0.0000||0.0000|0.0000|0.0000|0.0000|0.0000||0.0000||0.0000|0.0000|0.0000|1605.5000|